(01 · Planning & Permits)

Before you design,know what you can build.

Every property is different. We review your property, zoning, municipal requirements and project goals, and the approvals that may be required, so you know what may be possible before moving into detailed design.

What we review.

Before design begins · (08)
(01)

Zoning

What type of development or use may be permitted on the property.

(02)

Buildable area

How much space may be available for the proposed project.

(03)

Setbacks & height

The basic building envelope the design needs to work within.

(04)

Site conditions

Lot size, access, existing structures and other property-specific considerations.

(05)

Parking & access

Parking, lane access, vehicle access or other requirements where they apply.

(06)

Municipal requirements

The rules and approval process that apply in your specific municipality.

(07)

Required consultants

Whether the project may need structural, civil, energy, surveying, building science or other professionals.

(08)

Project direction

A realistic path forward, established before detailed design begins.

(Different cities. Different rules.)

Vancouver≠ Richmond≠ Burnaby

Building requirements can change significantly between municipalities, and sometimes between individual properties. We research the requirements that apply to your specific site, so decisions are based on the property itself rather than assumptions.

Vancouver · Burnaby · Richmond · Surrey · New Westminster

From idea to permit.

Managed by Rely · (08)
  1. 01

    Property review

  2. 02

    Feasibility

  3. 03

    Project direction

  4. 04

    Design & drawings

  5. 05

    Consultant coordination

  6. 06

    Permit application

  7. 07

    Municipal review

  8. 08

    Permit

We help manage the process so you don't have to figure it out alone.


What can we help you plan?

  • (01)Custom homes
  • (02)Duplexes & multiplexes
  • (03)Laneway homes
  • (04)Renovations & additions
  • (05)Commercial tenant improvements

What could work on your property?

Drawings · Rely Design Studio · (05)
  1. Property + municipal requirements
  2. Feasibility
  3. Possible layout

Feasibility turns municipal requirements and property constraints into a practical starting point. We look at how the allowable building area, setbacks, access, parking, layout requirements and your goals can begin to come together.

Site plan: laneway homeVancouver

Real drawings from Rely projects, shown without addresses or project histories, the point is how a property's constraints become a layout.

Why feasibility comes first.

01

Avoid designing something that cannot be approved.

02

Understand the major property and municipal constraints early.

03

Make informed decisions before investing heavily in design or construction.

(Planning & Permits FAQ)